Saturday, 6 June 2009

Perth Cottage New Build Day Seven

Perth Cottage New Build Day Seven
The hardcore arrived for the preparation of the concrete slab. This was laid and the pipes for the drainage put in place. A damp proof membrane will be laid over the hardcore, then insulation then the concrete on top of the insulation. Weather a bit mixed, sun and rain.

The mini digger spreads the hardcore stone evenly over the ground.